Start with essential equipment
A load schedule records equipment, operating power, phases, duty and simultaneous operation. Lighting, pumps, compressors and servers affect a generator differently. Loads that can be deferred or disconnected are identified separately. This establishes the backup requirement without arbitrary oversizing.
Account for starting and duty
A motor may need substantially more current while starting than while running. The engineer checks starting characteristics and acceptable voltage dip. Emergency standby and extended operation are different duties; their nameplate ratings are not interchangeable.
Check the site conditions
Ambient temperature, ventilation and installation conditions affect available output and reliability. Selection should record the model, duty, load assumptions and site requirements. Agreed commissioning tests verify suitability. kW and kVA describe different electrical quantities; conversion depends on load characteristics.
What to prepare for an enquiry
A load list, duty, outage duration and planned load growth.
Diesel generatorsManufacturer reference: Cummins · Application Manual T-030