A plan for the particular generator
Intervals and materials follow the specific model’s manufacturer instructions. Calendar age, running hours, dust, heat, extended standby and fuel quality matter. One replacement interval cannot apply to every generator. Plan service ahead around access and allowable outages.
Checks beyond consumables
Alongside oil and filters, checks cover the starting battery, charger, belts, leaks, cooling, connections and controller events. Transfer-control readiness matters: an engine may start manually but fail to receive the correct automatic command.
The service record
The report should list operations, materials, measurements, faults and recommendations. Untested items and additional work are recorded separately. The next service follows the schedule and condition, with load testing agreed with operations.
What to prepare for an enquiry
Model, hours, last service date, known faults and access arrangements.
Service and repair